Marble Falls Sidewalks.png

Tri-Campus Sidewalk Connectivity Enhancements

  • Client: City of Marble Falls
  • Location: Marble Falls, Texas
  • Scope: Hydrology & Hydraulics (HEC-HMS/HEC-RAS) + H&H Drainage Analysis (Atlas 14/DIR), Drainage Design (open ditch + culvert extensions/sizing), Street & Intersection Improvements (sidewalk/curb & gutter/ADA/crosswalks/striping/signage), Utility/SUE coordination, Permitting/Environmental (NEPA/CE), and Bid + Construction Administration
  • Project Details:
  • Miller Gray partnered with the City of Marble Falls and TxDOT to improve pedestrian safety and connectivity between three schools through the Tri-Campus Sidewalk Connectivity Enhancements. The project added new sidewalks, ADA-compliant ramps, drainage upgrades, and marked crosswalks to create safer routes for students and residents.
  • Miller Gray assisted in the hydrologic and hydraulic analysis. We also assisted in survey, utilities, and right-of-way needs. During construction, we supported contract administration and inspection to ensure compliance with City and TxDOT standards, maintaining safe access for schools, businesses, and the surrounding community.